Display Home quality inclusions No exceptions
At Pavilion Homes, we are dedicated to giving you Display Home quality brand inclusions.
Guarantees | | Others |
We complete your property within the move in date specified, after building approval is obtained, or we pay you $500 a week until completion |
|
|
Quality of finish will be as per our display home |
|
|
Structural Warranty on all work |
|
|
Brand name inclusions with local warranty agents |
|
|
Warranty maintenance period after handover as per set written procedure* |
|
|
No unexpected or hidden costs; all inclusive allowances for items required |
|
|
Detailed walk through handover process to ensure minimum maintenance and your satisfaction at handover |
|
|
General | | Others |
Architect designed home as per plan prepared |
|
|
All architect’s plans and consultants fees (survey, engineering) included |
|
|
Council fees & costs allowance for development & building approval (includes certifier’s fees) |
|
|
All builder communication and liaison with building inspector and certifier |
|
|
All site costs to level block as per contract plans to low M class soil allowance |
|
|
Provisional allowance for installation and connection of gas meter, electrical meter box, Transact box (if per estate requirement) and phone line |
|
|
Six star energy rating allowance for insulation, foil and double glazing (if needed) included in packages on our land (See specified property for allowance included) |
|
|
Optional: custom architect design service, landscape design, interior design (ask about including it in your proposal)
Ongoing Communication | | Others |
Regular progress meetings available upon request and noted in your contract |
|
|
Call, email or visit our office any time (by appointment) |
|
|
Optional: Additional frequency site meetings with you and/or architect. Ideal for custom architect designed home or where you would like further peace of mind or involvement |
|
|
Site Management | | Others |
Your site always managed by experienced licenced builders |
|
|
Building inspections are performed by qualified third-party company or council inspections |
|
|
Scheduled meetings with you on site are welcomed and architects, engineers or certifiers are invited (where needed) to ensure quality resolved from any site trade issues. Discuss your needs with us |
|
|
*Note due to insurance and safety reasons you are not able to enter the site on your own only by schedule appointmnet via our office
Quality of Work | | Others |
If work is not up to the building inspectors approval, engineers sign-off, display standard or per contract, we will have tradesmen make good at our cost as per your contract inclusions and plans. If you require higher levels of finish and tolerances please discuss with us when requesting your quote |
|
|
*Note where the builder refers any items to manufacturers warranty a response may be required from the manufacturer before a response can be provided to the client.
Related Articles